SAP R/3-PP MRP Parameters

- Instructions for Adjustment, Effects, Side-Effects -

Many companies are vigorously promoting the technical implementation of SAP R/3. Now they find themselves faced with the difficult task of setting the numerous para- meters in such a way as to best achieve company objectives, and not (very possibly) to interfere with them. Only if this is accomplished successfully will it be possible, for example, to decrease capital commitment, improve lead times, better adhere to schedules as well as achieve greater flexibility in Production.

The authors explain the individualized customizing of the SAP R/3-PP (Production Planning) MRP parameters and demonstrate their effects, interconnections and side-effects. Instructions are provided for requirements analysis and configuration for the area of MRP in Production Planning and Sales. Experts and managers from Production, Logistics and Purchasing receive guidance on how to select the para- meters so strategically as to accentuate their company’s special assets and objec- tives. Controllers are given tools to help them accompany parameterization from a business administrative view-point and to increase the investment in SAP R/3 to a greater extent than would be possible were they merely to follow general re- commendations and rules of thumb.

Numerous tips on topics such as safety stock and forecasting procedures, not only apply to SAP R/3, but to other PPS systems too, provided they are based on the same methods.

The 3rd Edition includes an additional chapter which demonstrates how you can use requirements navigation to set the SAP-R/3 parameters to your advantage.   


Contents:
 

  • Customizing SAP R/3-PP
  • Significance in Practical Terms
  • Configuration Tools as a Solution Approach
  • Requirements Navigation down to the MRP Parameters
  • Configuration Instructions for SAP R/3-PP MRP Parameters
  • Effects of the Parameters on Capital Commitment,  Lead Times, Adherence to Schedules and Flexibility in Production
  • Flexibility in Production


Target Groups:
  

  • Experts and Managers in Production, Purchasing and Logistics
  • System Administration and Controlling
  • Persons responsible for implementing and customizing PPS systems, esp. SAP R/3-PP
  • Application service providers
  • SAP consultants
  • University professors and students


Authors:

Jörg Dittrich, Peter Mertens, Michael Hau, Andreas Hufgard 


Additional Links

www.vieweg-it.de
www.livekit.de/sbs_ibis_e.htm 

 

January 26/27 2009: SAP-IBIS-Conference in Wurzburg

Note the date of our conference in January 2009 at this stage.

»